House Plans
House Plans
Location of Water Sump
Location of Water Sump
RCC water Tank
RCC water Tank
Features:

?Single Handle Wall Mount Rain Shower Faucet with Led Shower Head L-020
?It is water and energy saving shower faucet ,with square Led rain shower head
?With large spray face diameter that provides pleasure showering experience 
?Come with brass adjustable shower bar shower arm and water diverter
?LED aspect works under water pressure and no need for extra batteries 
?Temperature sensitive : 0-30C = Blue; 30-40C = Green; 41-50C = Red; 50-100C = flashing Red 
?Standard size 1/2 "plumbing inlet connections 
?Comes with all standard accessories and installation parts

http://www.wholesale-faucet.com/products-2497-Single-Handle-Wall-Mount-Rain-Shower-Faucet-with-Led-Shower-Head-L-020.html
Single Handle Wall Moun...
water falls
water falls
water sump
water sump
PVC Water Stopper - This has to be placed at construction joints. It prevents water seepage through construction joint.
PVC Water Stopper
Water seal
Water seal
Use of bad quality water in construction cause this.
Use of bad quality wate...
bathroom faucet chrome
bathroom faucet chrome ...
this is built for the water tank
water tank on top
Overhead Water Tank
Overhead Water Tank
Vastu Shastra- Importance of Water Element
Vastu Shastra- Importan...
Water Consumption
Water Consumption
Water tank distance
Water tank distance
Rain Water Pipe
Rain Water Pipe
Painting- The Sleeping Beauty
Painting- The Sleeping ...
Kids wall stickers- parachute, clouds, rain, airplane
Kids wall stickers- par...
Features: Mixture various colors, sizes latex particles you like to form a stable system when construction imitating a natural marble. High degree of imitation you will not able to tell the true marble from the imitation. It has much more modeling diversity, texture diversity and color diversity than nature marble and much more cheaper and safe.
Application: Applied to residence, hotel, school, office building, landmark of new-built and maintenance engineering of exterior finish. And also widely used in decorate and protect surface of the concrete, cement, brick structure.
Specification: 
Sheen: Mercerizing
Colour: So many colours for your choise
Theoretical Coverage: 2-4m²/ time/kg,Note: The practical consumption may vary with substrate condition, construction methods, environment and other factors.
Drying Time: Surface Dry: 8hours/25?,  Hard Dry: 48 hours/25?; Recoating: above 12 hours/25? (Drying time will be change because of the different temperature and humidity.)
Packing: 16kg/barrel
Imitation granite water...
Gas Geyser should be fitted in well ventilated area. not inside the bathroom
LPG water Geyser
under water bedroom
under water bedroom
Copyright 2007- GharExpert.com All rights reserved.  

 
 |  Advertize with us  |  About us  |  Contact us  |  RSS  |  Blog  |  Terms of service  |  Style made simple  |  Decorating slide show  |  Tips  |  Give your feedback  |