Construction (144) |
| Topic | Category(Topics) | Author | Replies | Last Reply | | Plinth beam at ground level | Brick Walls, Pi... (144) | santhosh 6/9/2016 1:09:39 PM | 2 | by:S L Gupta (Civil Engg)(Engineer) 6/11/2016 12:17:38 PM | | Cost estimation for G+1 house for 1200 land with 1000 Buit up | Brick Walls, Pi... (144) | Vignesh 6/10/2016 10:49:55 AM | 0 | | | Column Bars Specifications Reqd | Brick Walls, Pi... (144) | Pankaj Varshney(Engineer) 5/31/2016 4:57:45 PM | 3 | by:S L Gupta (Civil Engg)(Engineer) 6/2/2016 10:53:49 AM | | frame structure over existing load bearing masonry wall | Brick Walls, Pi... (144) | navneet 3/10/2016 9:57:47 PM | 4 | by:JAI PRAKASH(Engineer) 5/3/2016 12:27:42 AM | | Basement Plan | Brick Walls, Pi... (144) | anandp 3/10/2016 12:08:08 PM | 2 | by:JAI PRAKASH(Engineer) 5/3/2016 12:18:54 AM | | Column structure... | Brick Walls, Pi... (144) | R SURYAPRAKASHA 3/7/2016 10:45:34 AM | 4 | by:JAI PRAKASH(Engineer) 5/3/2016 12:12:02 AM | | position of partition wall | Brick Walls, Pi... (144) | ani 2/20/2016 9:21:20 PM | 3 | by:JAI PRAKASH(Engineer) 3/5/2016 10:05:04 PM | | Replacement or modification Of AC ROOF | Brick Walls, Pi... (144) | bipin karekar 2/16/2016 4:12:53 PM | 2 | by:JAI PRAKASH(Engineer) 3/5/2016 9:23:56 PM | | Removal of wall | Brick Walls, Pi... (144) | bhaskar 2/6/2016 11:34:16 PM | 2 | by:S L Gupta (Civil Engg)(Engineer) 2/8/2016 3:52:49 PM | | steel frame trusses | Brick Walls, Pi... (144) | bishwa acharya 2/1/2016 11:11:50 PM | 2 | by:JAI PRAKASH(Engineer) 2/7/2016 10:34:04 PM |
|