Estimator
1.Foundation2.Super Structure3.Flooring4.Plastering/Wall tiles
5.Door,Window,Cupboard shutt...6.Paint7.Totals 
Brick Work Sup. Str.
Area ( in sq.ft ) Description
ItemQuantityUnitsPrice Per UnitTotal Amount
CementBags
BricksNOS
SandCUM
Labour for Brick Sup. Str   
 Sub Total           Rs.
Area ( in sq.ft ) Description
Area ( in sq.ft ) Description
Brick Tile Tracing on Roof
Area ( in sq.ft ) Description
ItemQuantityUnitsPrice Per UnitTotal Amount
EarthCUM
Labour for Brick Tiles   
Brick TilesNOS
SandCUM
CementBags
BitumenKg
 Sub Total           Rs.
Rain Water Pipe
Area ( in sq.ft ) Description
ItemQuantityUnitsPrice Per UnitTotal Amount
CI PipeMeter
Labour for pipe including cost of Joints   
 Sub Total           Rs.
RCC
Area ( in sq.ft ) Description
ItemQuantityUnitsPrice Per UnitTotal Amount
CementBags
Coarse SandCUM
BazriCUM
ShutteringSFT
Labour for RCC   
 Sub Total           Rs.
Area ( in sq.ft ) Description
M S Steel for RCC
Area ( in sq.ft ) Description
ItemQuantityUnitsPrice Per UnitTotal Amount
MS SteelKg
Binding WireKg
Labour for Steel RCC   
 Sub Total           Rs.
Total cost of Super Structure       Rs.
  
The cost and material estimate shown here is derived using standard specifications for a home built using standard drawing.
The actual cost may increase or decrease based on the specifications used, material/labour cost at your site, contact us if you need additional information.
Copyright 2007- GharExpert.com All rights reserved.  

 
 |  Advertize with us  |  About us  |  Contact us  |  RSS  |  Blog  |  Terms of service  |  Style made simple  |  Decorating slide show  |  Tips  |  Give your feedback  |