Fri Mar 18, 2011 | Post #1 | S L Gupta (Civil Engg)
Join date: Mar 2008 | Dear Kanwer
There are many steps which are followed during construction of road.
1 Jungle clearance.
2 Demarcation of centre line.
3 Lay out
4Earth work.
5 Compaction of earth work.
6Dressing sub grade.
7. Laying edging
8 Laying soling coat.
9 Wearing coat
10 Finishing coat as per requirement. | |
|
Fri Mar 18, 2011 | Post #2 | kanwer sajjad
Join date: Mar 2011 | Post subject: road construction
hi sir ,
laying edging and dressing sub grade method plz help me.
,
| |
|
Fri Mar 18, 2011 | Post #3 | S L Gupta (Civil Engg)
Join date: Mar 2008 | Dear Kanwer
1 After compacting the earth work, the top layer of earth work is dressed to the level required with proper gradient and camber. After dressing the surface is rolled with road roller.
2. After preparation of sub grade brick edging is laid on both edges of road to protet the road material filled in the road and also protect the edge. | |
|
Fri Mar 18, 2011 | Post #4 | kanwer sajjad
Join date: Mar 2011 | Post subject: sewerline
hi sir,
thanx my question is related sewer line , excevation rail method in sewerage. | |
|
Fri Mar 25, 2011 | Post #5 | kanwer sajjad
Join date: Mar 2011 | Post subject: bridge
hi sir,
explain parts of RCC bridge. | |
|
|