2501 views | 1 answers | which city are in ......
I can tell you price as just now i have started the constrcution. |
|
1859 views | 1 answers | I have a plot of 40X25 where I am planning to construct Ground floor. but the roof will be exteded by 2 ft in front and 2 feet at the back.. o the area will be 40X29.How Engineer will calculate the cost per sq.ft 40x25 or 40x29 ( please note only roof will be extended). |
4088 views | 4 answers | I have a vacant land for 1420 Sq.ft, As of now I am planning to build Only ground floor but later I will build up to Second floor.
Can anyone let me know what should be the coumn size and gauge for TMT Steel rods.
I have attached ground floorPlan for your review. |
2436 views | 3 answers | I am planning to go for kajaria tiles, any comments and suggestions from Engineers and architects. |
2298 views | 1 answers | Hi
Can anyone tell me what is the difference between polish vertified tiles and glazed vertified tiles. which is the best for bedroom and hall. |
1662 views | 2 answers | Hi AllI have kitchen ready, i want to put kitchen cabinets,drawers below the kitchen slab and want to cover the lofts available in the kitchen.Please suggest me the designs and material to be used which should moderate in prices with durability and look.. |
1493 views | 1 answers | Hi My plastering is almost done and I am planning to paint.1. Do a coat of primer is required before patty on the interior walls.2. My engineer says he can do primer or coat of white cement ( only one) before the painting of exterior walls. what is the best primer or coat of white cement for exterior walls before painting. . |
1838 views | 1 answers | The best possible option for you is to join a construction company which will teach you a lot esp a contractor who does take govt projects,so that you can learn the art of deceiving. |
1700 views | 1 answers | Hi all
My house construction is nearing completion( Tks everyone for their support and comments).
My query is what are the check list of things which I should lookout before taking over from contractor.
I request eveybody to commnet on this however silly it may be.. |
1837 views | 2 answers | Please ensure that not too many wires gets packed in a PVC pipe/channel.Because electric wires gets heated up and if they touch each other it vill be hazardous,
Use certified cables, MCB, ELCB. |