Proper pipe work for sewerage and plumbing work ensures hygienic conditions in any building. All connections with main or branch pipes should be arranged in a way that can prevent cross flow from one appliance to another. Soil, waste and building sewer pipes should be of sufficient diameter in the direction of flow. Keep in following tips while designing and executing layout of sanitary pipes for the drainage of a building. 

  •  In sewer line minimum gradient should be 1 in 57 for 100 mm diameter pipe and 1 in 100 for 150 mm diameter.   
  • Pipe works and appliances should be arranged in a way that allows close grouping of connections with water closet near main soil pipe. 
  • Branch pipes should be kept short to reduce noise. 
  • When washbasin and bathroom are at some distance from stack, it may be cheaper and simpler to combine their waste pipe in to one pipe. 
  • Any bend in waste pipe should be of large radius. 
  • Pipe works in branch connections should be arranged to allow free drainage of system. 
  • Connections with main or branch pipes should be arranged in a way that can prevent cross flow from one appliance to another. 
  • Branch connections should be of large radius along the invert. 
  • Minimum diameter of soil and waste stacks should be 100 and 75 mm respectively. 
  • Covered pipes or hard to find pipes along internal face of walls should be of cast iron. 
  • On ground floor all pipes including those laid on external face of the wall should be of cast iron also. 
  • Sufficient condition should be made to access all pipe works.
  • Embedding of joints in walls should be avoided. 
  • All appliances connected to stack should be trapped directly. 
  • The soil, waste and building sewer pipes should not be reduced in diameter in the direction of flow. 
  • Cast iron fittings and branches for waste pipes should be of same quality.

 

;
Construct Sewerage and Water Supply of your house properly else you have to face many hygienic problems.Generally it is observed that some house owners do not pay proper attention towards these works.
Designing pipe lines in a house or building needs careful vision. There is no cross connection between pipes for drinking water and pipes containing impure and waste water.
Proper drainage system is essential for waste water of the house. Traps and water seal are an important part of drainage system. Appropriate use of the appliances saves us from various diseases and foul smell in the house.
A coupler connects the two pipes to each other. If the material and size of the pipe are not the same,it is called a 'reducing coupler'.
Sewer line and water supply line should have a separation of 3 meters in horizontal pipe line to avoid contamination of
Pipe work and appliances are arranged in such a way as to allow close grouping of connections with water closet.The pipes discharge waste water into a sewer directly or through a trapped drain.
Kota stone flooring is a subtle blend of grandeur and luxury giving the interior and exterior a gorgeous look.......
To get maximum ventilation and natural light in your house, make sure the building is properly oriented. Orientation of building saves energy and provides comfortable living as well. This article tells you about various factors and benefits of building orientation.
Preview some of the most impressive pictures of kitchen from GharExpert Gallery.
A solid roof on building is very important for everybody living in the house. The roof should be constructed in a way that assures you great safety. Here are given details about different types of roofing.
Frames of doors and windows are most important parts of your doors and windows. They are available in different size, height, width and shapes. Frames hold locks and hinges and support door and windows to shut and open easily. Here is what you need to know about different doors and windows frames.
Different steel bars are recommended for their relative tensile stresses.Steel bars are major components of construction.Here is what you need to know about steel bars (Sariya).
Brahmasthan is a powerful zone of the house. It should have open space for flow of energy in the house. The positive energy is very useful for living beings of the occupants of the house.
Brick work is an important part of construction work done with the help of bricks and cement mortar. It is done with different quality of bricks with different ratios of cement mortar according to the requirement.
Are you remodeling your bathroom? Bathroom shower doors make your bathroom a style icon. Read the following article that will help you select the bathroom shower door that will exactly suit your bathroom.
Living room or Drawing room should be located in east or north direction. The ideal location of a living room depends on plot facing.
Without knowing perfect mixture of cement and sand you can not achieve your goal.
Manufacturing date, grade and type play vital role in purchasing right cement and there should be no lumps in it.
First Class Bricks must be homogeneous in texture without showing appreciable sign of efflorescence.
A coupler connects the two pipes to each other. If the material and size of the pipe are not the same,it is called a 'reducing coupler'.


Plumbing Piping layout at the time of construction
Plumbing Piping layout at the time of construction
Construction Work with pipes
Construction Work with pipes
POP Ceilling, Pillar work at entrance, Stone work on wall Professionalism
POP Ceilling, Pillar work at entrance, Stone work on wall Professionalism
Guidelines for Laying Cement Concrete Floor
Guidelines for Laying Cement Concrete Floor
Wardrobe design guideline
Wardrobe design guideline
Pipe fitting for central ac
Pipe fitting for central ac
Clayware drainage pipes
Clayware drainage pipes
PVC pipes for drainage system
PVC pipes for drainage system
Ductile iron pipes
Ductile iron pipes
Cast Iron Pipes for Drainage
Cast Iron Pipes for Drainage
Rain Water Pipe
Rain Water Pipe
Slab concreting with pump (pipe line)
Slab concreting with pump (pipe line)
Overflow Pipe
Overflow Pipe
Pipes made of milsteel
Pipes made of milsteel
Loose Rainy Water Pipes
Loose Rainy Water Pipes
steel pipe
steel pipe
Plambing diagram showing pipes
Plambing diagram showing pipes
Rcc concrete wall kitchen chimney exhaust outlet pipe core cutting holes,porur,chennai
Rcc concrete wall kitchen chimney exhaust outlet pipe core cutting holes,porur,chennai
Brick wall kitchen chimney exhaust smoke stack outlet pipe holes/core drilling work,chetpet.
Brick wall kitchen chimney exhaust smoke stack outlet pipe holes/core drilling work,chetpet.
Brickwall kitchen chimney outlet pipeline after making holes/core cutting work
Brickwall kitchen chimney outlet pipeline after making holes/core cutting work
Plumbing Piping layout at the time of construction
Plumbing Piping layout at the time of construction
Ground Work
Ground Work
brick work and truss
brick work and truss
wooden Wardrobe work
wooden Wardrobe work
Wardrobe in veneer work'
Wardrobe in veneer work'
Clayware drainage pipes
Clayware drainage pipes
PVC pipes for drainage system
PVC pipes for drainage system
Ductile iron pipes
Ductile iron pipes
Cast Iron Pipes for Drainage
Cast Iron Pipes for Drainage
Guidelines for Laying Cement Concrete Floor
Guidelines for Laying Cement Concrete Floor
steel pipe
steel pipe
Loose Rainy Water Pipes
Loose Rainy Water Pipes
Overflow Pipe
Overflow Pipe
Rain Water Pipe
Rain Water Pipe
Pipes made of milsteel
Pipes made of milsteel
Slab concreting with pump (pipe line)
Slab concreting with pump (pipe line)
3dmax work
3dmax work
Working Table
Working Table
duplex revit work
duplex revit work
cement work
cement work
work in progres
work in progres
Tradionally painted work on ceiling
Tradionally painted work on ceiling
Steel Bars For RCC Work
Steel Bars For RCC Work
inlay work in flooring
inlay work in flooring
glass work
glass work
Ceiling with wood work
Ceiling with wood work
glass work
glass work
Computer work Station
Computer work Station
Exterior view of house under Construction work
Exterior view of house under Construction work
Stone work on walls
Stone work on walls
office work
office work
glass work
glass work
Nice Brick Work
Nice Brick Work
Brick Work On DPC
Brick Work On DPC
Work in Progress
Work in Progress
Cement Concrete and Brick Work in Foundation of Wall
Cement Concrete and Brick Work in Foundation of Wall
wood work
wood work
glass work
glass work
Art work on walls
Art work on walls
wood work
wood work
rcc concrete breaking work
rcc concrete breaking work
old building demolition works
old building demolition works
old debris disposal works
old debris disposal works
old building demolisher work
old building demolisher work
rcc diamond cutting contracting service work
rcc diamond cutting contracting service work
After old chimney demolishing work
After old chimney demolishing work
old rcc overhead tank dismantling work
old rcc overhead tank dismantling work
old building demolishing work
old building demolishing work
old rcc concrete breaking work
old rcc concrete breaking work
old building demolishing work through machine
old building demolishing work through machine

Contact us About us
Copyright 2007- GharExpert.com All rights reserved.