Sat Sep 08, 2012 | Total posts : 21 |
| Topic: Labour Cost for Roof RCC work
Dear Guptha sir
Query on Labour
Cost for Roof:-
I have hired a small contractor (labour contract on sq.
ft/cu.ft) for centring works for my two storied house in mangalore.
The Contractor has now completed RCC for second floor Roof.
The contractor’s quotation for second floor roof RCC is Rs. 40.70 per sq. ft for 4 ½” thick , 10 ft
height .
The size of Roof is 41.50 ft x 38.20 ft(1585.30 sq.ft).
The Centring Contractor has made roofing by having flat
surface from bottom of slab and sloping on top surface of slab for easy flow of
rain water. The centre of roof has thickness of
6”and sloped either side on top surface to end at 4 ½”.
Do I have to pay extra labour cost to the centring
contractor due to increase in thickness of roof slab since materials(cement,
gravel , steel and sand) is supplied by me?
Kindly advise
|
| |
Go to page: 1 2 >> |
Mon Sep 10, 2012 | Post #1 | S L Gupta (Civil Engg)

Join date: Mar 2008 | Dear Kamathak
From the contents given by you, it is clear that the contract is for shuttering of the roof with 4.5'' thick cement concrete on it. Now as stated by you that contractor place 6'' cement concrete in centre. So he he place some concrete extra from the contract as per requirement of design or as per site condition So labor for placing the extra cement concrete is payable to the contract. | |
|
Mon Sep 10, 2012 | Post #2 | kamathak2002

Join date: Sep 2012 | Post subject: Labour Cost for Roof RCC work
Dear Gupta sir,
Thank you for your reply.
Is there any standard estimating procedure to pay extra
labour cost for pouring in additional concrete.
Best Regards
Ashok Kamath | |
|
Mon Sep 10, 2012 | Post #3 | S L Gupta (Civil Engg)

Join date: Mar 2008 | Dear Kamathak
There is no any standard because this is between you and contractor. But as per contents send by you your contractor has to do shuttering for 1585.30 sqfeet weather he lays 4.5'' or 6'' concrete. So he is not elegible for extra on account of shuttering, however he place some cement concrete mix extra approximately 70 cft for which he is entiteled for taking extra labour for laying concrete at 2nd floor roof which is approximately from Rs 1000-00 to Rs 1500-00.for which he satisfy. | |
|
Mon Sep 10, 2012 | Post #4 | kamathak2002

Join date: Sep 2012 | Post subject: Labour Cost for Roof RCC work
Dear Gupta sir,
Thank you again for your kind reply. I appreciate your lone
effort in replying since there were 81 viewers. Good luck to you sir
Best Regards
AshokKamath
| |
|
Fri Sep 14, 2012 | Post #5 | Khalid Aleem

Join date: Sep 2012 | Post subject: Cost for construction
Dear Gubta,
I appreciate if you please let me know the construction cost of house per sq.ft. I am from Pakistan the prices of material is higher than india being the Pak rupee is week than indian rupee however if you let me know the formula of the construction material viz Sand, Cement, Iron Bar, Bajri so that I may calculate on the basis of your formula. The bricks price in Pakistan is Rs.4500/-(Pak Rupee) per 1000 bricks and cement bag of 20 kg is Rs.375 per bag and Iron bar is Rs.72000 per ton and Sand bowzer is Rs.12000 so If I make a house having 2000 sq.ft covered area what would be the cost of the house excluding paint and other work. The labour rate here in Pakistan for Mistri is Rs.600/-per day and labour Rs.400/-per day. Please advise me of the formula that I have requested for my further calculation.
Thanks and regards
Khalid Aleem
Rawalpindi (Pakistan)
| |
|
Fri Sep 14, 2012 | Post #6 | bubled

Join date: Sep 2012 | Post subject: Cost estimator
Hi KhalidHave you used the Estimator ( blue bar on the top) .it is a really handy tool and has all the formulas for different materials and mixes ,also it lets you enter the price at your location ,of different items. Hope it helps! | |
|
Thu Sep 20, 2012 | Post #7 | Engr.Md.Faruq

Join date: Sep 2012 | Post subject: Cost for construction
Dear Gupta sir, Thanks to you for your glorious help for us. How can I estimate for total costing of R,C,C slab with centering,labor,steel,materials every things.calculation to per 100 sft.
Thanks and Regards
Md.Faruq.
| |
|
Sat Sep 22, 2012 | Post #8 | Engr.Md.Faruq

Join date: Sep 2012 | Dear Gupta sir,
Thank you for your kind reply . How can I estimate for total costing of R,C,C slab with centering,labor,steel,materials every things.calculation to per 100 sft.head labor per day 500 Tk and helper per day 350 Tk.
Thanks and Regards
Md.Faruq.(Bangladesh)
| |
|
Tue Sep 25, 2012 | Post #9 | vinod

Join date: Aug 2012 | Post subject: constaruction material used in rcc roof
Dear Sir,
pls help me to calculate the material in rcc roof , my roof size is 43ft * 51 ft =2193 sq ft with four beam
cement = ?
dust =?
iron =?
iron 16mm=?
12mm=?
10mm=?
Regards
vinod kumar dahiya
| |
|
Sun Jan 27, 2013 | Post #10 | Sharma

Join date: Jan 2013 | Post subject: Rebar
Dear Sir,
Can you please help me for getting details of rebars & thickness of raft with footing & also deatails of rebar & thickness of slabs for my house which I need to builts in Groung + 3 floor each floor Height - 10 ft, On Beam & 16 colums Size 8" x 15" & total area Each floor is (40 x 36 Ft) = 1440. | |
|
Wed Jan 30, 2013 | Post #11 | S L Gupta (Civil Engg)

Join date: Mar 2008 | Dear Sharma
You are constructing 4 story building, so it is advisable to take structural detail design from any structural engineer which will be safe and economical. | |
|
Thu Aug 21, 2014 | Post #12 | kiran

Join date: Aug 2014 | Post subject: Need a cost estimate for a house
Hi Gupta Sir,
I have a 200 sq yards land in hyderabad area, im thinking to build ground floor and first floor house in my land , so i kindly request you to let me know the complete cost which needs to be spend by me to complete that house. (Please include every thing like labor, eletrician, water etc to have it like a complete house).
Please let us know if you need any additional details from my side.
Thanks Raj | |
|
Thu Aug 21, 2014 | Post #13 | S L Gupta (Civil Engg)

Join date: Mar 2008 | Dear Kiran
The cost of construction depends upon the drawing of building, its elevation and specification used in the construction. The cost can be derived with the help of plan.However the cost of construction range from Rs 1000-00per sft to 1500-00 per sft.
| |
|
Tue Aug 18, 2015 | Post #14 | kumarvs

Join date: Aug 2015 | Post subject: rebar size mention
sir i am construct building 20x20 room size.which type of rebar I can using for column,beam,slab,cantilever.pls mention the rebar size in mm. | |
|
Tue Aug 18, 2015 | Post #15 | S L Gupta (Civil Engg)

Join date: Mar 2008 | Dear Kumar Use 16 mm dia bars in column, 12mm bars in roof/ slab.
| |
|
Tue Aug 18, 2015 | Post #16 | kumarvs

Join date: Aug 2015 | Column size,beam size,beam rebar size and ring size for 20x20 room size pls mention
| |
|
Wed Aug 19, 2015 | Post #17 | S L Gupta (Civil Engg)

Join date: Mar 2008 | Dear Kumar The column should be 9''x9'' with 4 nos 16 mm bars and ring of 8mm 6'' c/c, beam 9''x 9'' with 6 nos 16 mm bars and ring of 8mm 6'' c,c. slab 12mm 6'' c/c on both side.
| |
|
Thu Aug 20, 2015 | Post #18 | JAI PRAKASH

Join date: May 2014 | Gupta Ji Rocks :) | |
|
Sat Jul 02, 2016 | Post #19 | Asif

Join date: Jul 2016 | Post subject: Total Cost for RCC 2000 sq.ft slab
Dear S.L. Gupta ji Can you please tell the total cost for 2000 sq.ft slab (including all expenses i.e. labour/shuttering/etc) | |
|
Mon Jul 04, 2016 | Post #20 | S L Gupta (Civil Engg)

Join date: Mar 2008 | Dear Asif Cost of RCC Slab for 2000 sft, 5'' thick and cement concrete 1;2;4 proximate cost is Rs 3 lac including material, labor and MS steel bars.
| |
|
|
Go to page: 1 2 >> |
Questions (39) | |
4255 views | 10 answers | Last answer on 10/27/2015 10:43:11 PM. by JAI PRAKASH. Forum started by Rahul | 3007 views | 0 answers | Last answer on 11/3/2011 9:48:40 PM. Forum started by Vijay Godse | 2682 views | 2 answers | Last answer on 6/8/2015 11:10:06 AM. by S L Gupta (Civil Engg). Forum started by sira |
| 3518 views | 1 answers | Last answer on 7/4/2020 2:03:37 AM. by S L Gupta (Civil Engg). Forum started by SAGAR | 4672 views | 4 answers | Last answer on 11/4/2021 8:45:13 PM. by S L Gupta (Civil Engg). Forum started by Prem Kant Mishra | 2355 views | 1 answers | Last answer on 6/7/2017 12:17:49 PM. by S L Gupta (Civil Engg). Forum started by Prem Kant Mishra | 4875 views | 3 answers | Last answer on 7/9/2020 10:10:27 PM. by S L Gupta (Civil Engg). Forum started by jptallam | 5137 views | 4 answers | Last answer on 3/25/2016 1:08:35 AM. by Tanish. Forum started by raviprakash | 3643 views | 1 answers | Last answer on 10/11/2021 6:38:16 AM. by S L Gupta (Civil Engg). Forum started by ragha | 18479 views | 6 answers | Last answer on 7/3/2014 2:27:06 PM. by Muhammad Rizwan. Forum started by ragha | 6456 views | 3 answers | Last answer on 12/11/2013 11:01:19 AM. by S L Gupta (Civil Engg). Forum started by Praveen Srivastava | 191988 views | 97 answers | Last answer on 1/23/2022 3:32:01 AM. by TanyaHerrera. Forum started by Bimlendra Jha | 2052 views | 2 answers | Last answer on 7/29/2015 12:07:00 AM. by JAI PRAKASH. Forum started by jeeveeka | 2638 views | 1 answers | Last answer on 5/26/2016 10:55:05 AM. by S L Gupta (Civil Engg). Forum started by Madhu Ranjan | 2546 views | 2 answers | Last answer on 7/3/2020 11:20:15 PM. by JAI PRAKASH. Forum started by tushar | 5882 views | 1 answers | Last answer on 11/1/2013 12:39:57 PM. by S L Gupta (Civil Engg). Forum started by Abhishek | 11936 views | 6 answers | Last answer on 7/3/2015 3:43:36 AM. by JAI PRAKASH. Forum started by Bs Dhiman | 4975 views | 3 answers | Last answer on 12/17/2016 11:39:42 AM. by S L Gupta (Civil Engg). Forum started by Satya | 3597 views | 1 answers | Last answer on 7/3/2020 11:16:44 PM. by JAI PRAKASH. Forum started by bharat patel | 204 views | 0 answers | Last answer on 1/11/2025 7:02:15 AM. Forum started by rupeshji | 70 views | 0 answers | Last answer on 1/11/2025 7:01:52 AM. Forum started by rupeshji | 19 views | 0 answers | Last answer on 1/11/2025 7:01:46 AM. Forum started by rupeshji | 27 views | 0 answers | Last answer on 1/11/2025 7:01:39 AM. Forum started by rupeshji | 24 views | 0 answers | Last answer on 1/11/2025 7:01:33 AM. Forum started by rupeshji | 24 views | 0 answers | Last answer on 1/11/2025 7:01:27 AM. Forum started by rupeshji | 0 views | 0 answers | Last answer on 1/11/2025 7:01:19 AM. Forum started by rupeshji | 25 views | 0 answers | Last answer on 1/11/2025 7:01:12 AM. Forum started by rupeshji | 21 views | 0 answers | Last answer on 1/11/2025 7:01:06 AM. Forum started by rupeshji | 23 views | 0 answers | Last answer on 1/11/2025 7:00:59 AM. Forum started by rupeshji | 18 views | 0 answers | Last answer on 1/11/2025 7:00:52 AM. Forum started by rupeshji | 23 views | 0 answers | Last answer on 1/11/2025 7:00:46 AM. Forum started by rupeshji | 23 views | 0 answers | Last answer on 1/11/2025 7:00:40 AM. Forum started by rupeshji | 27 views | 0 answers | Last answer on 1/11/2025 7:00:06 AM. Forum started by rupeshji | 24 views | 0 answers | Last answer on 1/11/2025 7:00:00 AM. Forum started by rupeshji | 26 views | 0 answers | Last answer on 1/11/2025 6:59:54 AM. Forum started by rupeshji | 25 views | 0 answers | Last answer on 1/11/2025 6:59:48 AM. Forum started by rupeshji | 28 views | 0 answers | Last answer on 1/11/2025 6:59:42 AM. Forum started by rupeshji | 23 views | 0 answers | Last answer on 1/11/2025 6:59:36 AM. Forum started by rupeshji | 23 views | 0 answers | Last answer on 1/11/2025 6:59:31 AM. Forum started by rupeshji |
|
|
|
Articles that might interest you! | | Labor Guideline for Steel bars in RCC Every process needs proper guideline and expert person or team to manage in construction or in any field. Even working.. | | RCC Roofing This roofing is very versatile and provides great protection. | | Guideline for Labor for Brick Work Foundation We all know the importance of brickwork in any construction, So the article here describes the guideline meant for la.. | | Guideline for Labor for Brick Work in Super Structure While going for construction, do we know the Guideline meant for Labor for Brick Work in Super Structure? If not then .. | | Tips for Laying RCC slab / roof RCC slab laying is one of major step in any type of construction so it is mandatory to know all the points related to .. | | Guideline for Labor for Brick Tile masonry What is brick tile work? What are the guidelines for labor for brickwork in superstructure? Don’t worry about all thes.. | | Analysis & Rates The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the tas.. | | Guideline for labor for Ceramic or glazed tiles Flooring is important phase of any construction and if you are going for ceramic or glazed tiles flooring you must be .. | | Labor Contract vs. material contract In building construction work, there are many aspects or things to be done by building owner such as arranging drawing.. | | Guideline for labor in cement concrete As we all know that cement concrete is one of the major part of any construction so are the guidelines for cement conc.. | | What are various types of glasses used in doors? Types of glasses used in doors-Clear window glass, Plate glass, Prism glass, Quartz glass, Processed glass....... | | What are advantages and disadvantages of folding doors? Advantages of folding doors- Easy to install,washable, durable, superior sound damping. Disadvantages-sensitive to har.. | | What are various designs available in wooden doors? Designs available in Wooden doors..... | | What is standard size of internal folding doors? Size, Thickness and Weight of Internal Folding Doors....... | | What affects the life of doors? What can we do to increase the life of the Wooden doors? Tips to increase the life of Wooden doors.... | | What is the standard size of frame for Plastic/PVC doors? Plastic Door frame size carrying one or two shutters...... | | What are various frames recommended for Plastic/PVC doors? Frames for Plastic Doors.......... | | Which place is appropriate for sliding door? Appropriate places for sliding doors-Bathrooms, Backyards, Commercial structures........... | | What are various frames recommended for glass doors? Frames for Glass Doors-Wooden frames, Steel frames, Aluminium frames...... | | Which place is appropriate for folding doors? Appropriate places for folding doors-Homes, Offices, Guest rooms, gives attaractive and stylish look........ | | What are the various accessories recommended for folding doors? Accessories for folding doors- Door Handles, Door Fasteners,Door Viewers....... | | What affects the life of doors? What can we do to increase the life of the Plastic/PVC doors? Tips to increase the life of Plastic doors.... |
|
|
|